London Eye in £12.5m upgrade
David Quainton, 19 May 2009
Be the first to comment on this article
Merlin Entertainments is to spend £12.5m improving and upgrading the London Eye - the biggest investment since the attraction opened nine years ago.
The Eye will receive a "minor visual facelift" and be equipped with both better heating and an "advanced capsule" with wi-fi and ceiling mounted screens.
The programme commences this summer to be completed in time for the London 2012 Olympics, and will not interrupt normal operation of the attraction.
As each capsule is removed, it will travel down the Thames to Silvertown in London's docklands where it will be loaded onto a truck and transported to a workshop in Worcester to be upgraded before returning to the London Eye.
A non-operational capsule will take position on the London Eye until the final capsule is returned. This project will serve to reduce downtime and maintenance on the London Eye, though it will continue to close for a short period in January to perform routine maintenance
012年倫敦奧運會,備受觀光客歡迎的倫敦眼摩天輪(London Eye)今年將進行大幅翻新整修,經費高達1250萬英鎊。 管理倫敦眼摩天輪的Merlin Entertainments公司表示,倫敦眼上32個載客的膠囊狀座艙,將逐一被拆下整修更新,未來客艙內將有多媒體螢幕及無線 ...
沒有留言:
張貼留言